Laserfiche WebLink
DRAFT 1219 . 4203 <br /> received, and appropriate disposal methods <br /> are determined. <br /> 9. All steam-cleaner runoff water and sludge, <br /> as well as water generated during well <br /> development shall also be contained in <br /> 55-gallon leak proof and sealable steel <br /> drums. Drums will be marked with boring <br /> number and will be stored onsite until <br /> laboratory results are received and <br /> appropriate disposal methods are <br /> determined. <br /> SAFETY <br /> The site to which is Scope of Work applies has not been <br /> declared a hazardous site and severe contamination is not <br /> expected. However, routine precautionary safety measures <br /> shall be observed and will include the following: <br /> o No smoking or eating within 25 feet of the <br /> rig. <br /> o During all drilling operations, hard hats, <br /> leather footwear, full length trousers, and <br /> -11- <br />