My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2200 - Hazardous Waste Program
>
PR0513859
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2020 4:11:46 AM
Creation date
10/31/2018 11:47:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513859
PE
2220
FACILITY_ID
FA0009476
FACILITY_NAME
PG&E: Stockton Gas Plant
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
St
City
Stockton
Zip
95203
APN
137-320-02, 04
CURRENT_STATUS
01
SITE_LOCATION
535 S Center St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\535\PR0513859\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
3/27/2018 5:56:21 PM
QuestysRecordID
3836769
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. <br /> I � <br /> 11Engineer/Geologist is replaced by PG&E, his/her replacement shall <br /> 2 meet the requirement of this paragraph (para. 3 . 6) . <br /> 3 3 . 7 . Progress Meetings and Ouarterly Summary Reports. Within 90 <br /> 4 days of the effective date of this Order and quarterly thereafter <br /> o for each preceding three calendar months, PG&E shall submit a <br /> 6 Quarterly Summary Report of its activities under the provisions of <br /> 7 this Order. The report shall describe: a) specific actions taken <br /> 8 by or on behalf of PG&E during the previous three calendar months, <br /> 9 b) actions expected to be under taken during the current three ) <br /> 10 calendar months, c) all planned activities for the next three <br /> i <br /> 11 calendar months, any requirements under this Order that were not <br /> 12 completed and any problems or anticipated problems in complying with <br /> 13thisOrder, d) all results of sample analyses, tests and other data <br /> 14 generated or received by PG&E under this Order, and e) if any <br /> I <br /> 15ichangesare anticipated in the overall schedule of activities at the <br /> 16 Site, there will be a revised proposed schedule submitted by PG&E <br /> 17 for review and approval by the Department, consistent, if <br /> 181 appropriate, with Paragraphs 3 . 21 and 3 . 22 of this Order. The <br /> 19 � <br /> ( Quarterly Summary Report shall be received by the Department by the <br /> 20 15th day of the first month after each quarterly period ends. In <br /> 21 addition to the Quarterly Summary Reports, the parties shall engage <br /> 221 in periodic progress meetings, to be held at the reasonable request <br /> 23i of the Department and at its offices, which the parties anticipate <br /> ;&41 will be quarterly in frequency or as otherwise agreed by the <br /> 25 <br /> parties. <br /> 26 3 . 8 . Quality Control/Quality Assurance. All sampling and <br /> I <br /> 27 <br /> analysis conducted by PG&E under this Order shall be performed in <br /> i I <br /> -APER 26 <br /> CA LI/011 NIA <br /> (REV. B•721 <br /> I <br /> �I <br />
The URL can be used to link to this page
Your browser does not support the video tag.