Laserfiche WebLink
i <br /> l are described in more detail. <br /> 2 Task Schedule <br /> 3 1. Project Coordinator Within 30 days of the <br /> 4 submittal by PG&E effective date of this Order. <br /> 5 (Para. 3 . 5) <br /> 6 2 . Project Engineer/Geologist Within 30 days of effective <br /> 7 submittal by PG&E date of Order. <br /> 8 (Para. 3 . 6. ) <br /> 9 3 . RI/FS Workplan Submittal August 1, 1991 <br /> 10 by PG&E (Para. 3 . 1. 1) <br /> 11 4 . Interim Remedial Measure <br /> 12 by PG&E (Para. 3 . 0) <br /> 13 a. Workplan submittal by Within 45 days of effective <br /> 14 PG&E for mitigating date of Order. <br /> 15 exposure to exposed <br /> 16 residues. <br /> 17 5. Public Participation Plan Within 90 days of effective <br /> 18 submittal by PG&E date of Order. <br /> 19 (Para. 3 . 2) . <br /> 20 6. 1st Quarterly Summary Report Due October 15 1991. <br /> 21 covering July through <br /> 22 September 1991. <br /> 23 <br /> 24 3 . 21. Extension Requests. If PG&E is unable to perform any <br /> 25 activity or submit any document within the time required under this <br /> 26 Order, PG&E may, request an extension of the specified time in <br /> 27 writing. The extension request shall include a justification for <br /> PAPER 33 <br /> CALIFOIN IA <br /> 3 1REV. e•72i <br />