My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2200 - Hazardous Waste Program
>
PR0513859
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2020 4:11:46 AM
Creation date
10/31/2018 11:47:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513859
PE
2220
FACILITY_ID
FA0009476
FACILITY_NAME
PG&E: Stockton Gas Plant
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
St
City
Stockton
Zip
95203
APN
137-320-02, 04
CURRENT_STATUS
01
SITE_LOCATION
535 S Center St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\535\PR0513859\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
3/27/2018 5:56:21 PM
QuestysRecordID
3836769
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> j <br /> 1 ' hazardous substances at or from the Site; <br /> 2 (d) identify and evaluate appropriate response measures to <br /> 3 prevent or minimize future releases and mitigate any releases <br /> 4 which have already occurred; and <br /> 5 (e) collect and evaluate the information necessary to prepare <br /> 6 <br /> a Remedial Action Plan (RAP) in accordance with the <br /> i <br /> 7 requirements of Health and Safety Code Section 25356. 1. <br /> 8 3 . 1. 3 RI/FS Workplan Contents. The RI/FS Workplan shall be <br /> 9 designed to allow PG&E to meet the objectives in Paragraph 3 . 1.21 <br /> 10 and shall cover, at a minimum, each of the following elements: <br /> 11 a. Project Management; <br /> 121 b. Scoping; <br /> 131 C. Sampling; <br /> 14j d. Quality Assurance/Quality Control ; <br /> 151 e. Data Management; <br /> 16 f. Health and Safety; <br /> 17 � g. Public Health and Environmental Evaluation; <br /> 181 h. Feasibility Study; <br /> 19 i. Other Activities ; and <br /> 201 j . Schedule; <br /> 21 with each of the elements described in greater detail as follows: <br /> 22 a. Protect Management. The Workplan shall describe how the <br /> 23I project will be managed by PG&E and its contractors, <br /> 241 subcontractors and consultants including an organization chart <br /> 251 with the names and titles of key personnel and a description <br /> 26 <br /> Iof their individual responsibilities; <br /> I <br /> 27I b. Scoping. The workplan shall make an evaluation of <br /> �APBR l <br /> CALIFORNIA 12 <br /> ,REV, 6.721 <br />
The URL can be used to link to this page
Your browser does not support the video tag.