My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2200 - Hazardous Waste Program
>
PR0220074
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 10:43:29 AM
Creation date
10/31/2018 12:27:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0220074
PE
2220
FACILITY_ID
FA0002715
FACILITY_NAME
NEWARK RECYCLED FIBERS
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
01
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHURCH\800\PR0220074\COMPLIANCE INFO 2017-PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2017-PRESENT
QuestysRecordDate
5/4/2017 6:33:34 PM
QuestysRecordID
3259761
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Piping will be protected against freezing and corrosion and <br /> all dry sprinkler pipes and fittings will be installed so that <br /> the system can be totally drained. <br /> e. All systems having more than 20 sprinklers will have a local <br /> waterflow alarm which sounds an audible signal on <br /> premises upon water flow through the system. <br /> f. The minimum vertical clearance between sprinklers and <br /> materials in the area below the sprinklers is 18 inches. <br /> 4. Maintenance of Sprinkler System. <br /> The maintenance department or service provider will perform all <br /> maintenance and annual service which includes: <br /> a. The main drain flow test will be performed on the system <br /> annually. <br /> b. The inspector's test valve will be opened every two years <br /> to assure that the sprinkler system operates properly. <br /> C. Proper acceptance tests for systems installed after <br /> January 1, 1981 will include the following: <br /> 1. Flushing of underground connections; <br /> 2. Hydrostatic tests of piping in the system; <br /> 3. Air tests in dry-pipe systems; <br /> 4. Dry-pipe valve operation; and <br /> 5. Tests of drainage facilities. <br /> d. Records of all maintenance, service checks, and annual <br /> service will be maintained by the maintenance department <br /> and reflect dates of tests performed and services provided <br />
The URL can be used to link to this page
Your browser does not support the video tag.