My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2200 - Hazardous Waste Program
>
PR0514115
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2020 10:11:37 AM
Creation date
10/31/2018 12:45:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514115
PE
2249
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Supplemental fields
FilePath
\MIGRATIONS\C\CORRAL HOLLOW\15999\PR0514115\COMPLIANCE INFO 2015.PDF
QuestysFileName
COMPLIANCE INFO 2015
QuestysRecordDate
2/14/2018 5:54:51 PM
QuestysRecordID
3615097
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAWRENCE LIVERMORE NATIONAL LABORATORY -SITE 300 Hazardous Waste Facility <br />EPA ID No. CA 2890090002 Post -Closure Permit <br />Effective Date: April 3, 2003 Page 7 of 13 <br />A: Within 60 days of the effective date of this permit, the Permittee shall <br />submit to DTSC for review and approval a groundwater monitoring <br />well design and monitoring plan. <br />B: Within 90 days of DTSC's approval of the groundwater monitoring -well <br />design and monitoring plan, the Permittee shall install the subject well. <br />C: Within 60 days of completion of well installation, the Permittee shall <br />submit to DTSC as -built drawings. <br />D: The Permittee shall conduct the sampling and analysis of this additional <br />groundwater monitoring well in accordance with the requirements <br />listed in Table 1 and with the post -closure permit application dated <br />December, 2001. <br />P <br />
The URL can be used to link to this page
Your browser does not support the video tag.