My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2200 - Hazardous Waste Program
>
PR0514115
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2020 10:11:37 AM
Creation date
10/31/2018 12:45:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514115
PE
2249
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Supplemental fields
FilePath
\MIGRATIONS\C\CORRAL HOLLOW\15999\PR0514115\COMPLIANCE INFO 2015.PDF
QuestysFileName
COMPLIANCE INFO 2015
QuestysRecordDate
2/14/2018 5:54:51 PM
QuestysRecordID
3615097
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAWRENCE LIVERMORE NATIONAL LABORATORY -SITE 300 Hazardous Waste Facility <br />EPA ID No. CA 2890090002 Post -Closure Permit <br />-Effective. Date: April 3, 2003 Page 6 of 13 <br />c) Pursuant to CCR, title 22, section 66264.117(b)(1) the post -closure care <br />period shall extend 30 years from the effective date of the permit. This <br />period may be extended or shortened as provided in CCR, title 22, section <br />66264.117 (b) (2)(A) and (B). <br />d) A post -earthquake visual inspection shall be conducted by the Permittee <br />according to the following table. The inspection must take place within <br />three days of the earthquake. An inspection will be triggered when the <br />earthquake is of "M" magnitude in the Richter scale and the earthquake <br />epicenter is within a distance of "D" miles from the facility. <br />M <br />D <br />M <br />D <br />M <br />D <br />M <br />D <br /><4 <br />see note <br />5.1 <br />22 <br />6.3 <br />42 <br />7.5 <br />69 <br />4.0 <br />10 <br />5.2 <br />23 <br />6.4 <br />43 <br />7.6 <br />71 <br />4.1 <br />11 <br />5.3 <br />25 <br />6.5 <br />45 <br />7.7 <br />73 <br />4.2 <br />12 <br />5.4 <br />27 <br />6.6 <br />47 <br />7.8 <br />76 <br />4.3 <br />13 <br />5.5 <br />28 <br />6.7 <br />50 <br />7.9 <br />78 <br />4.4 <br />14 <br />5.6 <br />30 <br />6.8 <br />52 <br />8.0 <br />80 <br />4.5 <br />15 <br />5.7 <br />32 <br />6.9 <br />54 <br />8.1 <br />83 <br />4.6 <br />16 <br />5.8 <br />33 <br />7.0 <br />57 <br />8.2 <br />85 <br />4.7 <br />17 <br />5.9 <br />35 <br />7.1 <br />59 <br />8.3 <br />87 <br />4.8 <br />18 <br />6.0 <br />37 <br />7.2 <br />61 <br />8.4 <br />90 <br />4.9 <br />19 <br />6.1 <br />38 <br />7.3 <br />64 <br />8.5 <br />92 <br />5.0 <br />20 <br />6.2 <br />40 <br />7.4 <br />66 <br />For earthquakes of less than 4.0 Richter magnitude, if significant damage <br />has been reported within 10 miles radius from the facility, the Permittee <br />shall conduct a post -earthquake inspection. <br />5. " COMPLIANCE SCHEDULE <br />The Permittee shall install one additional groundwater monitoring well within 10 <br />feet of the boundary of the capped HE Open Burn Treatment Facility as shown <br />on Figure 3. This well shall be installed and tested in accordance with the <br />following compliance schedule: <br />
The URL can be used to link to this page
Your browser does not support the video tag.