My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALMOND
>
215
>
2900 - Site Mitigation Program
>
PR0521276
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2018 1:43:05 PM
Creation date
10/31/2018 1:29:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0521276
PE
2950
FACILITY_ID
FA0014461
FACILITY_NAME
KBHOME ALMOND WOOD ESTATES
STREET_NUMBER
215
Direction
E
STREET_NAME
ALMOND
STREET_TYPE
DR
City
LODI
Zip
952061841
CURRENT_STATUS
01
SITE_LOCATION
215 E ALMOND DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i k9 KLEINFELDER <br /> Kleinfelder proposes collecting one grab groundwater samples from the SimulProbe boring at <br /> depths ranging from 60 to 70 feet bgs. Specific sampling depths will be selected based on field <br /> observations of soil and groundwater depths encountered. The single groundwater sample will <br /> be analyzed for the following analyses: <br /> • Total Purgeable Petroleum Hydrocarbons as referenced to Gasoline [TPH-G] by EPA <br /> Method 8015M <br /> • Benzene, Toluene, Ethylbenzene, Xylenes [BTEX] by EPA Method 8020 or 602 <br /> • Total Extractable Petroleum Hydrocarbons as referenced to Diesel [TPH-D] by EPA <br /> Method 8015M/3015 <br /> • <br /> Purgeable Organics by EPA Method 8260 <br /> • DBCP by EPA Method 8011 <br /> Kleinfelder proposes submitting a total of nine soil samples in the UST area, three from each <br /> soil boring at depths ranging from 5 to 20 feet bgs. The nine soil samples will be submitted for <br /> the following analyses: <br /> • Total Purgeable Petroleum Hydrocarbons as referenced to Gasoline [TPH-G] by EPA <br /> Method 8015M with MTBE distinction <br /> • Benzene, Toluene, Ethylbenzene, Xylenes [BTEX] by EPA Method 8020 or 602 <br /> • Total Extractable Petroleum Hydrocarbons as referenced to Diesel [TPH-D] by EPA <br /> Method 8015M/3015\ <br /> • Total Lead by EPA Methods <br /> After collection, the soil samples will be labeled, logged on a chain-of-custody form, and <br /> immediately stored in an iced cooler. The soil and groundwater samples will be submitted to a <br /> State certified laboratory for the requested analyses <br /> The samples will be analyzed on a normal laboratory schedule requiring approximately two weeks <br /> (ten working days) for completion unless the optional rush analytical turnaround is requested by the <br /> client at an additional charge. <br /> Task 3 —Offsite Groundwater Review <br /> Kleinfelder has included information related to the "Lodi Groundwater Site" in our Phase I report <br /> of the subject site, which documents groundwater contaminants in proximity and upgradient of <br /> the subject site. Kleinfelder understands that KB Homes want to conduct additional review of <br /> this upgradient contaminant plume to assess both current and potential impacts to the subject site. <br /> Kleinfelder recommends interviewing project related personnel from the lead regulatory agencies <br /> and the most current documents related to the Lodi Groundwater Site. Based on review and <br /> availability of documentation and pertinent personnel Kleinfelder will include conclusions and or <br /> recommendations relevant to this offsite source of concern. <br /> 02001PROP.ENV/ST03PO65 Page 5 of 10 <br /> Copyright 2003,Kleinfelder,Inc. February 20,2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.