Laserfiche WebLink
v <br /> + U <br /> Mr Martin Harris <br /> ry April 27,2004 <br /> • Page 2 of 7 <br /> Duncan of EHD conducted the grout inspection and observed field activities <br /> 2.0 INVESTIGATIVE PROCEDURES <br /> 2.1 Permitting <br /> Drilling permits were obtained from EHD prior to initiating fieldwork All fieldwork was <br /> performed in accordance with the Ground Zero's Site Safety Plan and Quality Assurance/Quality <br /> Control Plan <br /> 2.2 Cone Penetrometer Testing <br /> Fisch advanced one CPT boring (CPT1) on January 12, 2004 utilizing a 25-ton, combination <br /> direct push/hollow stern auger drilling rig Boring CPT1 was drilled within a few feet of well <br /> MW1 (Figure 2) to determine shallow soil stratigraphy beneath the site Due to rod refusal, <br /> drilling was terminated at a depth of approximately 35 feet below ground surface (bgs) Electric <br /> CPT data transmitted from the cone tip provided information on soil behavior by measuring <br /> penetration resistance, friction ratio, and pore pressure Correlation of soil behavior to soil type <br /> was made electronically, based on a soil classification chart interpreted by Robertson & <br /> Campanella (1983) A copy of the CPT log is included in Attachment A <br /> '* 2.3 Drilling and Soil Sampling <br /> Fisch completed soil boring SB4 using direct push drilling methods, installed groundwater <br /> monitoring wells MW5 and MW6 using hollow stem auger drilling, and installed well MW7 <br /> using direct push procedures during the period January 12, 2004 through January 14, 2004 <br /> Soil samples were collected continuously from borings MW5, MW6, and MW7 using a 4-foot <br /> long core sampler lined with inert plastic sleeves, which afforded soil identification and <br /> subjective evaluation of contamination A photo ionization detector (PID) was used to monitor <br /> the soil for volatile organic compounds (VOCs) Soil samples selected for analysis, based on field <br /> observations and PID readings, were sealed, labeled, and immediately placed in an iced cooler for <br /> transportation to Argon under chain of custody protocol Selected samples were analyzed for total <br /> petroleum hydrocarbons as gasoline (TPHg) using modified EPA method 8015B, benzene, toluene, <br /> ethylbenzene, and xylenes (BTEX) using EPA method 8021B, and oxygenated gasoline additives, <br /> including 1,2-dichloroethane (1,2-DCA)and ethylene dibromide (EDB), using EPA method 8260B <br /> All drilling and sampling equipment was decontaminated prior to and between each use to <br /> minimize the possibility of cross contamination <br /> 2.4 Discrete Groundwater Sampling <br /> On January 12, 2004, Fisch advanced one direct push boring (SB4) adjacent to boring CPT1 <br /> Groundze/sou2m/reports/WELLRPT2b doc <br />