Laserfiche WebLink
Ll <br />Yes No Womment <br />Contin== Plan and Eme=ency Procedures (cont.) <br />Chapter <br />Does the p an all emergency equipment <br />including the location, pl�ysical description, and <br />outlineof s •. • <br />Does the plan include an evacuation plan with <br />signals to begin evacuation, evacuation routes <br />and alternate routes? (66265.52(f)] <br />Is a copy of the plan, and all revisions to the <br />Maintained <br />at the facility? <br />(b) Submitted to all entities with desi7A. <br />ULZ•axnse rolls? <br />Has the plan been reviewed and immediatelyl, <br />amended, if needed, whenever: [66265.54-] <br />(a) Applicable regulations are revised? <br />(b) The plan fails in an emergency? <br />(c) Facility changes require it? <br />(d) The list of emergency coordinators changes:�iC <br />(e) The list of emergency equipment changes? <br />Is there at all times at least one employee at the <br />generator's facility, or close by and on call, <br />designated as EC, who is thoroughly familiar with <br />all facility operations, wastes, records, layout, <br />and emergency procedures, who has authority to <br />commit'the resources to carry out the contingency <br />plan? (66265.55] <br />Revised 7/15/91 Page 23 <br />