Laserfiche WebLink
E <br />lorl TIM -o <br />If an emergency occurred at this facility, did <br />the EC immediately: [66265.56-] <br />Yes No Comment <br />(a) Activate alarm systems and notify <br />appropriate response agencies? <br />(b) Identify the dharactex, source, amount and <br />areal extent of released materials? <br />(c) Asses the possible direct and indirect <br />hazards from the release, including gases and <br />run-off of fire fighting materials? <br />(d-) M-kem assessment determines that the release <br />could threaten human health or the envirormpant <br />outside the facility: <br />(1) Report his findings to appropriate <br />authorities if it may be advisable to <br />evacuate the local area, and remain on call <br />to help authorities decidel> <br />(2-) Immediately notify the State Office of <br />Emergency Services with a report including <br />required information? <br />(e) During emergency, does EC take all <br />reasonable measures to minimize release? <br />(f) If the facility had to stop operations to <br />respond, does the EC monitor all appropriate <br />equipw-nt? <br />(g) After the emezgency, does the EC immediately <br />provide for the TSD of recovered or contaminated <br />material resulting from the rel - <br />r+ - <br />Does the EC ensure that in the affected <br />areas of the facility: <br />(1) Wastes incompatible with released <br />material are riot handled until after clean-up <br />is complet- <br />- - <br />ergency equipmezit listed in <br />contingency plan is clean and fit for use <br />before operations resume7 <br />Does the generator notify the Department, <br />state and local authoes that 66265.56(h) is <br />ccaplied with before resumingcperations in <br />affected - <br />c• • - <br />contingency plan was implemented, did <br />the generator record details of the dent in <br />the operating record and, within 15 days, submit <br />a written report to the Department? <br />Revised 7/15/91 Page 24 <br />