Laserfiche WebLink
SENT BY:KINKO'S STOCKTON, CA. ;10-28-93 ;12:44PM ; 2099573972 <br />• <br />WORE PLEA YOk PLATING LINE EQUIPAENT EE MAL <br />CIRCUIT WURLS, INC., S1'OUKTM, CALIFORNIA <br />SITE SPECIFIC MEALTH AND SAFETY PLAN <br />PURPOSE <br />CCITT ECM;# 7 <br />The purpose of this site specific Health and Safety Plan is to provide <br />the field personnel and visitors with an understanding of the potential <br />chemical and physical hazards that exist or may exist during the <br />Performance of the decontamination of the plating line equipment. <br />The areas of concern are: <br />1. Removal of hazardous wastes from equipment (if required) <br />2. Triple rinsing of equipment. <br />3. Removal and druming of liquids. <br />PRoj= SAYXTT PERSOIIREL <br />This site specific Health and Safety Plan will be enforced by the on- <br />site project manager, Steve Mueller of Omni Environmental Group. <br />Nis responsibilities include but are not limited to: <br />a. Maintaining safety equipment supplies. <br />h. Direct decontamination operations and emergency response <br />operations if required. <br />C. Setting up work zones, markers, and signs. <br />d. Reporting any problems or infractions of safety rules. <br />.MF -51 1) U. <br />We anticipate that the deontamination process will take approximately <br />One (1) working day to complete. <br />We anticipate that the acucal equipment removal will take one (1) <br />working day to complete. <br />/// SITE SAFETY RH HDATlONS <br />Hazard Determination. <br />Serious Moderate Low X unknown. <br />A modified Level C to upgrade to Level C if air contaminate levels <br />exceed 50ppm. <br />The minimum acceptable level of protection is a Modified Level C. <br />4. <br />