My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
152
>
2200 - Hazardous Waste Program
>
PR0539866
>
COMPLIANCE INFO 1988 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 10:46:00 AM
Creation date
10/31/2018 4:06:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988 - 2015
RECORD_ID
PR0539866
PE
2230
FACILITY_ID
FA0022802
FACILITY_NAME
CIRCUIT WORKS INC
STREET_NUMBER
152
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
152 FRANK WEST CIR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRANK WEST\152\PR0539866\COMPLIANCE INFO 1988 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 1988 - 2015
QuestysRecordDate
3/1/2018 11:18:34 PM
QuestysRecordID
3813371
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />PROPOSAL FOR SITE REMEDIATION <br />CIRCUIT WORKS, INC. <br />152 FRANK WEST CIRCLE <br />STOCKTON, CALIFORNIA <br />This proposal describes activities and their associated costs proposed for a site <br />remediation to be conducted at the former Circuit Works, Inc. facility located in Stockton, <br />California (Site). Remediation activities will include completing the 13 tasks described in the <br />Scope of Work section of this proposal. Except for the replacement of the asphalt in Task <br />4.0, work described in Task 2.0, Task 3.0, Task 4.0, Task 5.0 and Task 6.0 has been <br />completed. This proposal is based on an inventory of chemicals and contaminants present at <br />the site which have been inventoried by C.K.C./Allwaste. <br />SCOPE OF WORK <br />The scope of work for this project is comprised of 13 tasks which are listed below. <br />Task 1.0 Develop Work Plan and Site Specific health and Safety Plan <br />Task 2.0 Construct Site Security Fencing <br />Task 3.0 Clean-up of Lead Bearing Filter Cake Sludge Spilled Outside the <br />Facility <br />Task 4.0 Removal and Replacement of Asphalt Impacted with Oil <br />Task 5.0 Relocation of 55 -gallon Capacity Poly Drums Containing Chemicals <br />Task 6.0 Inventory, Identify and Label Chemicals <br />Task 7.0 Removal of Hazardous Chemicals and Contaminants <br />Task 8.0 Removal of Piping Located in the Concrete Sumps and <br />Drainage System <br />Task 9.0 Steam Cleaning of Concrete Sumps, Drainage System and Floors <br />Task 10.0 Removal of Ceiling Piping and Ventilation Ducts <br />Task 11.0 Bead Blasting of Concrete Floors <br />
The URL can be used to link to this page
Your browser does not support the video tag.