Laserfiche WebLink
Pay attention to the interaction between people,and share information; <br />BORKE <br />E <br />CH <br />(pT3cfflD"&'AM. IT <br />When starting the equipment,need to re -confirm the surrounding environment, to ensure that <br />personnel are in safety; (can use whistled, ringing the bell, etc.) <br />In the maintenance of equipment, to ensure that power supply is in closed state, and hung <br />warning board; <br />There need a specially -assigned person to manipulation of the electric switch. <br />4 INSTALLATION PROCEDURE <br />Counting and sorting equipment. <br />Look at installation site construction situation, such as whether the ditch construction civil <br />puddle is according to our drawing, steam boiler, water distribution, water inlet pipe and the <br />use of sources is in place. <br />M -T-, 8T rVT- (AA M rig <br />% JL, #ttr &#JLX 2 Q 12T r�'i'F-) <br />Communication with the client for the installation plan and equipment required for <br />installation personnel and facilities. Such as forklift, 8T crane (for hoisting washing machine, <br />De -baling machine and Chain plant machine need 2 crane 12T) <br />14 <br />