Laserfiche WebLink
BORETE <br />CH <br />According to assembly drawing line equipment installation, thought of installation should be <br />clear,put the install component parts to the designated places, according to the general layout <br />of the project by any single start at one end connection installation process order. <br />ta#*' 4M, 3t&* Wi i W Mo <br />When stay overall installation of basic equipment has been in place,the electric control <br />cabinet can take its place in the electrical system, external power supply into line, <br />producingcable bridge,wiring and connection water pipe and steam pipe. <br />5 tlf 9' -__N A, MECHANICAL CHECKPOINT <br />After finishing the installation,shouldclean cleaning equipment,and check whether there <br />aresomething left in every stand-alone equipment. (such as: metal, screw nut, wrench, <br />screwdriver, etc.) <br />Check each single machine equipment, platform joint screw nuts are tight and fret. <br />X1W^Cvffix* (XciM, %* V) <br />For each operating equipment, (reducer, bearings, etc.) filling mechanical lubricating oil. <br />Operating very stand-alone equipment, and judging the operation direction of the equipment. <br />Check the equipment is running normally, if there is any abnormal noise, find out the reason, <br />ruled out in time. <br />6 �, �,W. ELECTRICAL CHECKPOINT <br />is <br />