My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BORETE <br />CH <br />According to assembly drawing line equipment installation, thought of installation should be <br />clear,put the install component parts to the designated places, according to the general layout <br />of the project by any single start at one end connection installation process order. <br />ta#*' 4M, 3t&* Wi i W Mo <br />When stay overall installation of basic equipment has been in place,the electric control <br />cabinet can take its place in the electrical system, external power supply into line, <br />producingcable bridge,wiring and connection water pipe and steam pipe. <br />5 tlf 9' -__N A, MECHANICAL CHECKPOINT <br />After finishing the installation,shouldclean cleaning equipment,and check whether there <br />aresomething left in every stand-alone equipment. (such as: metal, screw nut, wrench, <br />screwdriver, etc.) <br />Check each single machine equipment, platform joint screw nuts are tight and fret. <br />X1W^Cvffix* (XciM, %* V) <br />For each operating equipment, (reducer, bearings, etc.) filling mechanical lubricating oil. <br />Operating very stand-alone equipment, and judging the operation direction of the equipment. <br />Check the equipment is running normally, if there is any abnormal noise, find out the reason, <br />ruled out in time. <br />6 �, �,W. ELECTRICAL CHECKPOINT <br />is <br />
The URL can be used to link to this page
Your browser does not support the video tag.