Laserfiche WebLink
"'' BORETE <br />T SCH <br />�`�g4g *jA*4f � 4� a] iii <br />Electric control cabinet in place after installation, check the screw of the circuit breaker, <br />contactor, thermal relay,if there are any loose,tight in time, ensure safe use in the operation. <br />Check line connection is correct, (e.g.,whether power line inverter power of frequency <br />changer is correct) <br />-ARhYcr, n % *iP14 f)jffl* gMFF A: VSA F,MXMN— <br />After the completion of the inspection, should test the electric control cabinet, use multimeter <br />to measure voltage is in accordance with the grid. <br />ff Akre; t�AiA PLC nVf ?-, „ lit -I'M f� A -W' 14, O;gT-3 t1N, )A R1 ck1E. <br />Start preliminary debugging of PLC program, check every action is correct, if there is any <br />wrong, correct in a timely manner. <br />According to the production process, after the debugging, determine the final control mode. <br />7 PRODUCTION INFORMATION <br />7.1INSTALLATION REQUIREMENTS <br />gF&fj(temperature):—10°N40°C <br />g(jjA(Humidity):85% IIF Orbelow <br />(Air Condition): f i' 'h' '—ice, �'ft'(W AX q#tTk *PfTi <br />No causticity gas, Explosive Gas, well draughty location. <br />i z-ff*ffi(Location):- P4 Indoor <br />j'R'Kapacity): 3000 kg(h &ISA Input for Bottle, Flake washing line 3000kg/h <br />fi�)QAPJ(Maximum Height) :7.3m <br />*M*A(Water consumption) :7.5 M3 /hour <br />&IMMM*(Wash detergent requirement) A. NaOH <br />B. Na3POa <br />16 <br />