My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"'' BORETE <br />T SCH <br />�`�g4g *jA*4f � 4� a] iii <br />Electric control cabinet in place after installation, check the screw of the circuit breaker, <br />contactor, thermal relay,if there are any loose,tight in time, ensure safe use in the operation. <br />Check line connection is correct, (e.g.,whether power line inverter power of frequency <br />changer is correct) <br />-ARhYcr, n % *iP14 f)jffl* gMFF A: VSA F,MXMN— <br />After the completion of the inspection, should test the electric control cabinet, use multimeter <br />to measure voltage is in accordance with the grid. <br />ff Akre; t�AiA PLC nVf ?-, „ lit -I'M f� A -W' 14, O;gT-3 t1N, )A R1 ck1E. <br />Start preliminary debugging of PLC program, check every action is correct, if there is any <br />wrong, correct in a timely manner. <br />According to the production process, after the debugging, determine the final control mode. <br />7 PRODUCTION INFORMATION <br />7.1INSTALLATION REQUIREMENTS <br />gF&fj(temperature):—10°N40°C <br />g(jjA(Humidity):85% IIF Orbelow <br />(Air Condition): f i' 'h' '—ice, �'ft'(W AX q#tTk *PfTi <br />No causticity gas, Explosive Gas, well draughty location. <br />i z-ff*ffi(Location):- P4 Indoor <br />j'R'Kapacity): 3000 kg(h &ISA Input for Bottle, Flake washing line 3000kg/h <br />fi�)QAPJ(Maximum Height) :7.3m <br />*M*A(Water consumption) :7.5 M3 /hour <br />&IMMM*(Wash detergent requirement) A. NaOH <br />B. Na3POa <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.