My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BORETE <br />CH <br />10.1 FUNCTIONAL CHARACTERISTICS <br />BFW Eh#V–J1j4 4T#T V. <br />BFW plate chain conveyor is mainly responsible for sending the bottle brick into the De- <br />baler,then the De -baler break up the bottle brick. <br />10.2 �ZaRa 4 INSTALLATION PRECAUTIONS <br />Plate chain conveyor all itself connected with screw connection, when installation, pay <br />attention to bolt fastening. <br />10.3 OPERATION PRECAUTIONS <br />�:. J-. M ZG-3 )*431 MP 14V] J7� <br />ZG-3 VMfjjMa VA —!� <br />�I 1� 40 - #MWS *A—fes <br />9M -T il ZG-3 VM4T1jMa 10 <br />AA r_'A AAiAM-�R310F <br />Before commissioning, in addition to the general inspection installation is in accordance with <br />the technical requirements, still must check: <br />All fittings connection fastening are reliable, safe, regular maintenance, must not loose; <br />All moving parts lubrication on a regular basis as required: <br />In head and tail bearing,please use ZG-3 calcium base grease,once a month. <br />Spiral tension device guide rail and screw,please use ZG-3 calcium base grease,once a <br />month. <br />Drag chain wheel,please use 40# machine oil,once every half a month. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.