My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DVRi 1 rr <br />CH <br />Sleeve roller chain,please use ZG-3 calcium base grease,once every 10 days. <br />Gear Reducer According to the gear reducer manual maintenance. <br />11 #101*k DE -BALING <br />11.1 JNtMV1 FUNCTIONAL CHARACTERISTICS <br />kT_f1i�*E '9#IL (M 11-1) <br />The workshop section equipment comprises of feeding conveyor, bale breaking machine (Fig. <br />11-1) and discharging double -screw conveyor. The PET placed on the conveyor are <br />transported to bale breaking machine which loosens bottles through forceful rotation and then <br />deliver them to next process—complete bottle rinsing machine by discharging -double screw <br />conveyor. <br />M 11-10 xA#'9#L Fig.l l-1 Bale Breaker <br />11.2 INSTALLATION INSTALLATION PRECAUTIONS <br />77 � <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.