Laserfiche WebLink
BOiWiL <br />Prior to installation, the installation techniques and drawing requirements shall be understood, <br />and the equipment shall be installed as the location and dimension specified in the drawing; <br />Perform all lifting and handling procedures are strictly forbidden to hit motor reducer to avoid <br />damage; <br />Electrical connection shall be conducted in accordance with the drawing of electric cabinet, <br />and the power output terminal of the electric cabinet and the connecting terminal of the <br />equipment drive motor shall be connected in line with the wire marking. <br />11.3{ OPERATION PRECAUTIONS <br />mit, 05!fM4- Y" TTS#' m; <br />X 3A#IL <br />1±'i4L JWfl YAIT —Hid T �: <br />Before commissioning, in addition to the general inspection installation is in accordance <br />with the technical requirements, still must check: <br />All fittings connection fastening are reliable, safe, regular maintenance, must not loose; <br />Each moving parts require periodic lubrication, the speed reducer of lubricant oil shall <br />not be lower than the minimum amount of standard height; <br />The signal and the control device and electrical wiring is correct; <br />Motor running to observe de -baler machine, belt machine, discharging screw running <br />direction is correct; <br />During the test run should undertake the following work: <br />25 <br />