My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BORHIL7 <br />CH <br />7 <br />UM/ Agentia tank <br />8 <br />1994 -it/ Magnetic turning column level gauge <br />9 <br />MMR/ Pre -washing machine <br />10 <br />&A #ILS Q / Pre -washing machine stand <br />12.2 INSTALLATION PRECAUTIONS <br />�cR�u )E -At K K trc R *fH MM-5AZ, 9 NKPh%rV4A11aR�� ; <br />M P&OMM, nixM$kPl, "7T1_AYa%Ak#11 _F)i, �0�YAt b-"gWW; <br />�3t*#IL. VRM3,r#J1�71cfik'1, 74,1,:AIA7ix t; <br />12-3),i�'hit <br />Prior to installation, the installation techniques and drawing requirements shall be understood, <br />and the equipment shall be installed as the location and dimension specified in the drawing; <br />No strike to the motor reduction box and screw is allowed during elevation and handling to <br />prevent deformation and damage. <br />While lifting the washing machine for installation, provide proper protective measures to <br />prevent the ropes from scratch the surface painting of the machine, and ensure the load on the <br />ropes is stable to avoid side slipping. When the equipment is hoisted, no person is permitted to <br />walk under it for the avoidance of an accident; <br />The bodies of washing machine, vibrating screen and wheel screening machine should be in <br />the horizontal state, or otherwise, they may influence the normal operation of the equipment. <br />During the installation, closely link the various facilities should link, make tight the flange that <br />connects the pump with the pipeline added with waterproof cushion, and fasten and connect the <br />bolts symmetrically and uniformly to ensure the reliable sealing without water leakage; <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.