My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOREIE <br />CH <br />s <br />'af[All 7IR, 9ta A11-1 1xAa3R, 3�th,aR1f±9R�,�.Ah,E�`J+I A#LkCWaflIR,) <br />��(iThI � 2643M'NMAR)J)o <br />A newly installed screw conveyor should run idle for 2 hours and run with load for 8 hours <br />before being put into use. <br />Prior to commissioning, in addition to compliance of installation with technical requirements, <br />inspection shall be carried out on the following items: <br />The fasteners between connecting pieces shall be checked to ensure secure and safe connection. <br />They shall be subject to regular maintenance to prevent looseness; <br />The electrical signal and control device as well as their connection shall be checked to ensure <br />normal service; <br />Start the motor and observe whether the rotation direction of the rods is correct; <br />The following work should be conducted during commissioning: <br />The screw conveyor should be stable and reliable and the fastening pieces have no sign of <br />looseness. <br />After 2 hours' run, the bearing temperature should be less than or equal to 40°C with good <br />lubrication and sealing. <br />No oil leakage or abnormal noise happens to the reducer and the electrical appliances and <br />couplers are safe and reliable. <br />It should enter normal use if all going well where attention should be paid to: <br />The screw conveyor should be started up with no load, that is to say, it should be started with <br />no materials in the shell. Materials may be fed in the machine only after the startup. <br />At the initial feeding of the screw conveyor, the feed speed should be gradually increased to <br />the rated delivery capacity and the feedstock should be uniform, otherwise, the delivery <br />42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.