Laserfiche WebLink
BORETE <br />E <br />WTaIg*g,W CH <br />18.3 2�('Rak JA INSTALLATION PRECAUTIONS <br />Prior to installation, the equipment installation techniques and drawing requirements shall be <br />understood, and the equipment shall be installed as the location and dimension specified in <br />the drawing; <br />In installation, no strike to the equipment is allowed during elevation and handling to prevent <br />equipment deformation and damage; <br />The equipment platform of crusher shall be laid stable and be parallel with the contacting <br />ground to prevent vibration; <br />The equipment body shall be checked to make sure there is no tool or impurity dropped or left: <br />in the crusher. <br />18.4 J �a-& A OPERATION PRECAUTIONS <br />i �4;��u, P, —)R I ft, �1cRA ���� A TcVk1A*V gF IA A t'A t: <br />�-VnTt-N 0, LAW,#4�[NZ; <br />A'4nel" #aATAij-�; <br />*4RJJWhmnA%F]04 W#F-T}f ; <br />�fRMHtA44,9 F lxt)JWr; <br />-'3it�-�'; i! A" �pq �ARPf�Vt 1i R,N <br />59 <br />