My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DORS A ri <br />WL�ZR*44941*4PR%�49 CH <br />Always clean up the machine tool, in order to ensure the machining accuracy and the service <br />life of the machine tool. <br />Long-term use of the machine should not cut off the power, the relative motion of each <br />surface to be coated with grease. <br />18.5.4 X-'7F7fflI S OPERATION AND ADJUSTMENT <br />Complete the foundation according to the machine tool foundation. <br />AVVRM1,MP-� , &iE71c-T&o <br />Adjust the Machine foot bolts, calibration level. <br />Electrical control box installed by professional electrical personnel, and link the electrical <br />wiring to the electrical control box according to the machine tool foundation drawing. <br />01*1*Wff� <br />Connect the main power,turned on the power switch , jog grinding down limit switch, check <br />the direction of travel , If in the opposite direction, you need to swap the main power line <br />click. <br />Note that don't open first grinding head start switch to prevent reversal. <br />��,Ilfcs4'p�1r� #Tfgf, )n9�^ F# <br />The machine drive belt and saddle connections for elastic connection.Vibration machine work <br />appears commutation, then slightly loosen the nut under three springs.When the belt occur <br />serious slippage,then slightly tighten the three springs under the nut. <br />7Jf-'c—�iT7a 77�iJJ a �llE�, }SIA ��1'C�F�c,F r�i <br />62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.