Laserfiche WebLink
DVREIri <br />CH <br />5 <br />�7N� ffl/ Medicine stirring barrel <br />11 <br />&7WI)ryer <br />6 <br />3 2/ 3 tons hot wash <br />vibration separation combination 2 <br />12 <br />iMAMA/ Medicine stirring barrel <br />20.2 � T 1A: INSTALLATION PRECAUTIONS <br />r leu `�t 11 c r #x t7� 0 NMPfrT�`7T _XTxR—It �z ; &t ER N" <br />Al LWIFI <br />M_V iiM <br />Prior to installation, the equipment installation techniques and drawing requirements shall be <br />understood, and the equipment shall be installed as the location and dimension specified in <br />the drawing; <br />No strike to the equipment is allowed during elevation and handling in installation, to prevent <br />deformation and damage; <br />With respect to the gearing and the blender of hot -washing machine, which are dissembled <br />when leaving the factory for the purpose of transportation, the coupling at the lower part of <br />the gearing shall firstly be connected to the blender well, and then the gearing shall be <br />connected to its fixed frame with bolts during onsite assembly. <br />The dryer and the fraction machine, which are complete machines, shall be laid flatly during <br />installation. <br />During installation, an overall inspection shall be conducted on each part to ensure the <br />equipment body is intact and each component is tightly connected. <br />86 <br />