My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DVREIri <br />CH <br />5 <br />�7N� ffl/ Medicine stirring barrel <br />11 <br />&7WI)ryer <br />6 <br />3 2/ 3 tons hot wash <br />vibration separation combination 2 <br />12 <br />iMAMA/ Medicine stirring barrel <br />20.2 � T 1A: INSTALLATION PRECAUTIONS <br />r leu `�t 11 c r #x t7� 0 NMPfrT�`7T _XTxR—It �z ; &t ER N" <br />Al LWIFI <br />M_V iiM <br />Prior to installation, the equipment installation techniques and drawing requirements shall be <br />understood, and the equipment shall be installed as the location and dimension specified in <br />the drawing; <br />No strike to the equipment is allowed during elevation and handling in installation, to prevent <br />deformation and damage; <br />With respect to the gearing and the blender of hot -washing machine, which are dissembled <br />when leaving the factory for the purpose of transportation, the coupling at the lower part of <br />the gearing shall firstly be connected to the blender well, and then the gearing shall be <br />connected to its fixed frame with bolts during onsite assembly. <br />The dryer and the fraction machine, which are complete machines, shall be laid flatly during <br />installation. <br />During installation, an overall inspection shall be conducted on each part to ensure the <br />equipment body is intact and each component is tightly connected. <br />86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.