My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOREM <br />CH <br />The flanges connected to the feeding inlet and the discharging outlet shall be closely joined <br />and rubber washers shall be laid between flanges to prevent feed and water leakage; <br />The flanges connected to the air duct and the cyclone dust collector shall be closely joined <br />without any clearance and rubber washers shall be fitted between flanges to prevent air and <br />feed leakage. <br />20.3 JIVO"Wj�,► OPERATION PRECAUTIONS <br />S ii'; <br />1 TV1TA- #73f�1<AA81MeQ, n A1�9M-Lf f, 4n, VAI]M L tg& on <br />Prior to commissioning, in addition to compliance of 'installation with technical requirements, <br />the following inspections shall be carried out: <br />Each fastener shall be checked to ensure it is firmly tightened; <br />The belts of friction machine and dryer shall be checked to ensure the tightness degree is <br />proper; <br />The flexibility of rotors of friction machine and dryer shall be checked to ensure the bearings <br />at the two ends are lubricated enough; <br />87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.