My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOREM <br />ri <br />CH <br />rT <br />got; <br />M*# Lt V #L, �Ef ( IV919 -A,b&**7G ) ; <br />W -46A LIrR (#- V 13.2 OrM,j) ill) ; <br />Prior to installation, the equipment installation techniques and drawing requirements shall be <br />understood, and the equipment shall be installed as the location and dimension specified in <br />the drawing; <br />With respect to the gearing and the blender of rinsing machine, which are dissembled when <br />leaving the factory for the purpose of transportation, the coupling at the lower part of the <br />gearing shall firstly be connected to the blender well, and then the gearing shall be connected <br />to its fixed frame with bolts during onsite assembly. <br />The dryer is an overall unit (see 19 Centrifugal Drying Unit). <br />(Refer to 13.2 Screw Conveyor) for the installation of screw conveyor. <br />Electrical wiring shall be conducted as the drawing of electric cabinet, and the power output <br />terminal of the electric cabinet and the connecting terminal of the equipment drive motor shall <br />be connected in line with the wire marking. <br />21.3 JV -0 a & A OPERATION PRECAUTIONS <br />'M-V[MT'�rA[1n-PT 1; <br />)KA(#LAV M* AAAT' A it; <br />90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.