Laserfiche WebLink
BOREM <br />ri <br />CH <br />rT <br />got; <br />M*# Lt V #L, �Ef ( IV919 -A,b&**7G ) ; <br />W -46A LIrR (#- V 13.2 OrM,j) ill) ; <br />Prior to installation, the equipment installation techniques and drawing requirements shall be <br />understood, and the equipment shall be installed as the location and dimension specified in <br />the drawing; <br />With respect to the gearing and the blender of rinsing machine, which are dissembled when <br />leaving the factory for the purpose of transportation, the coupling at the lower part of the <br />gearing shall firstly be connected to the blender well, and then the gearing shall be connected <br />to its fixed frame with bolts during onsite assembly. <br />The dryer is an overall unit (see 19 Centrifugal Drying Unit). <br />(Refer to 13.2 Screw Conveyor) for the installation of screw conveyor. <br />Electrical wiring shall be conducted as the drawing of electric cabinet, and the power output <br />terminal of the electric cabinet and the connecting terminal of the equipment drive motor shall <br />be connected in line with the wire marking. <br />21.3 JV -0 a & A OPERATION PRECAUTIONS <br />'M-V[MT'�rA[1n-PT 1; <br />)KA(#LAV M* AAAT' A it; <br />90 <br />