Laserfiche WebLink
DV�i-rE1E <br />1 4'�AMAIMVY+, ME -T- AAAC;M4i, t tktat Vs; <br />A 7 �1i zK i 71ci h�'c M. q, <br />Prior to commissioning, in addition to compliance of installation with technical requirements, <br />the following inspections shall be carried out: <br />Each fastener shall be checked to ensure it is firmly tightened; <br />The dryer belt shall be checked to ensure its tightness degree is proper; <br />The flexibility of dryer rotor shall be checked to ensure the bearings at the two ends are <br />lubricated enough; <br />The electrical signal and control device as well as their connection shall be checked to ensure <br />they are correct; <br />The equipment shall be checked to ensure it is in normal operation and whether there is any <br />noise; <br />The motor shall be started up to check whether the operation direction is correct; <br />The operators shall not put the hands into the parts operating at a high-speed to avoid <br />accident; <br />The inflow shall be controlled within a reasonable range to prevent water waste due to <br />excessive water and effect on cleanliness of finished product due to insufficient water, and the <br />91 <br />