Laserfiche WebLink
BORMl'i <br />CH <br />;RAM_x*n1file, rM <br />Each fastener shall be checked to ensure it is firmly tightened; <br />The electrical signal and control device as well as their connection shall be checked to ensure <br />they are correct; <br />The motor shall be started up to check whether the operation direction is correct; <br />The operators shall not put the hands into the parts operating at a high speed to avoid <br />accident; <br />The bearing temperature shall be frequently checked during operation to ensure it is normal. <br />The temperature rise shall not exceed 40°C. In case of violent vibration of fan, strike and <br />rapid temperature rise of bearing, emergency shutdown shall be conducted without any <br />operation with failure. <br />The finished product bag shall be selected and cleaned before filling to prevent residual <br />impurity; the quality of bottle flake (such as luster and impurity) shall be observed from time <br />to time and abnormity, if any, shall be reported to the staff or the foreman responsible for the <br />previous procedure for handling; <br />The bag shall be filled with full and sufficient content, which can be pushed and pressed with <br />hands, or be compacted by the rapid up -down motion of forklift, or be pressed by filling device <br />with vibratory equipment. <br />24 rK I j giff ROTARY SCREEN <br />MIR PET ,944M+[YJNL%i. _15EWA0 <br />Q , "#4� F1 • t'(�M9f. A , AMJ::M9fI A . #ILS, %KMia , �H1&A Q rE4E 1.h46, 0 M 24- <br />10 <br />The function of the rotary screen is to remove the mud ,sand, caps, labels and so on in <br />the PET bottles. It is consist of charging hopper, discharging hopper, main transmission, <br />secondary transmission, machine frame, roller and waste discharging screw. Fig 24-1 <br />24.1 2�IE T�4 INSTALLATION PRECAUTIONS <br />98 <br />