My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />31.1.1OPERATION PROCEDURES AND KEY POINTS <br />ff#LAflFt y7tPwM WNffi+4 4Z JV*IAMWa#L, r)lqRfi�E M & )MrPA <br />VAMW <br />�htfr fkl`111 (dip#T� ;, Afflr� <br />V, 4f;MtG , ;N�9111M# ,#1LfT i 0Fn, T&A <br />When operating,first of all,should be started the discharging screw of the De -baler, then <br />operate the De-baler.After that,please place the bottle brick in the middle of the chain <br />plate conveyor belt compactly (wire strapping direction should be parallel to the chain <br />plate conveyor belt), use the broken wire clamp cut the wire and take it away (please <br />don't cut wire of the last bottle brick, to prevent the wire rebound to hit somebody and <br />bottles scattered when cutting), and then open the chain plate conveyor belt, observe <br />the bottle and remove the entanglement of the bottle inside the bottle brick (such as <br />packing tape, wire, ribbon, film, bag, etc.); After unpacking still need to see if there are <br />more than the allowed range of bottle labeling machine, if have the same need to pick <br />out; In addition, when feeding also requires operator control the feeding speed, try to be <br />chartered discharging screw send material uniform; Please observe the entanglement <br />on the De -baler aperiodically and clean up in time. When stopping, should be stop <br />feeding chain plate conveyor belt first, then stop the De -baler, otherwise the De -baler <br />stop first, the bottle brick on the feeding conveyor belt will extruding the De-baler,when <br />startup next time,it may be due to overload that will beunable to operate properly. <br />31.1.2 V -X t lj / j COMMON FAULTS AND SOLUTIONS <br />QI.What should be done in case of poor bale breaking effect and remaining unbroken flake <br />pieces? <br />A:tfrr'``IJ7�i�``t'G#IL�,`��:AfA7�#ILI�n�C�c, <br />JR,f <br />133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.