My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DORETE <br />JEJ CH <br />A: If the entanglement in the bottle brick is not be selected, winding on the De -baler <br />machine,it will affect the unpacking effect.What is more serious is that to lead the De - <br />baler bound tightly,and unable to run normally.So it need to be cleaned in time. And <br />when the speed of the feed chain machine is too fast, it can also lead to incompletely <br />unpacked. <br />-P <br />Q3: <br />1 i <br />Q3: What should be done in case of startup failure in bale breaker as its column spinner <br />pressed by by PET due to inappropriate operation (stop operation mistake or too high feeding <br />speed) during production? <br />A: Mrn <br />A: After power outage, reverse the direction of the feeding conveyer belt. Switch on conveyer <br />belt to make it retrogress for 40 or 50 centimeter and then stop the belt. Start up bottle bale <br />breaker. After it recovers to normal, adjust the conveyer belt to the original direction. <br />31.2 &A,-*� BOTTLE WASHING UNIT <br />31.2.1jj' ex FT A7-Oi, OPERATION PROCEDURES AND KEY POINTS <br />ff K A11F�4, 7tM10 9 M, ra4, M—O�C�iAM3MVIP & )" W. Mi A -&PP TF - <br />131 50Kg, NaOH25kg-30Kg, =M I0kg-20Kg (rltF6 +, M <br />R97 f�;±'MXA;—Vi2i-MA p -M 85°C -90°C) fM <br />(iJI�G"tc#Ilfk1) . 3MpJT)ig x <br />134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.