Laserfiche WebLink
BORKE <br />E <br />al <br />Make sure blade in crusher is well assembled and fastened and no other metal matters within <br />the crusher before operation. Start discharge screw of crusher, turn on cooling water pipe to <br />inflow, and then start up the crusher. After it operates stably, the platform conveyer belt can be <br />opened for feeding. When stopping the equipment, the feeding shall be stopped first and then <br />the crusher shall be stopped after all the crushed bottle materials are discharged. <br />When changing blade, first of all, cut down the power and hang a warning sign on to inform <br />other workers to avoid maloperation. In addition, pay attention to the space between moving <br />blade and stationary blade. The smaller distance is, the better for the blade on the premise of <br />not touching, provided with no contact. Blade with a large distance has short service life, and <br />it can be worn easily with small crush capacity. After blades installed, slowly rotate the knife <br />rest for several circles. After confirming there is no error, tighten the bolt. <br />Note: All bolts of fixed crusher must be tightened, or the blades easily become flexible to <br />damage whole blades and even sometimes destroy crusher when crusher is high-speed <br />operating. <br />31.6.2 14/�'� 4,o a COMMON FAULTS AND SOLUTIONS <br />Ql : What should be done in case of bottle materials pile-up in the crusher when the discharge <br />is slow? <br />A: 77T4%f1, X-7-0; <br />TIT, fll w)ct, _A:#ZT_A 777'&*Af, T40fJ, >l_ <br />A: After using for a period, the crusher blade needs to be changed because of blunt. If <br />discharging is unsatisfactory soon after such change, the reason might be that blade of crusher <br />not installed well where large space exists, or the blade is not sharpened, or the belt of crusher <br />is a little bit loose, and belt creeps, for which the bolt under electrical machine base need to be <br />adjusted and the belt need to be fastened. <br />31.7ll� �i' 7}C 7 G CENTRIFUGAL DRYING UNIT <br />31.7.1 ' �/�y OPERATION PROCEDURES AND KEY POINTS <br />140 <br />