My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Z P <br />fF#IL�t L cif&7k#IL, SIA miz� TSK3 tffP" OAZ V; MUMEM431PI7 <br />Start up dryer first. After it operates properly, open up feeding screw. The speed of feeding is <br />adjustable, which shall be operated slowly. Stop feeding screw before stopping the machine, <br />and the dryer shall be turned off after making sure all materials in have been discharged. After <br />each shift, the powder within the dryer should be washed. <br />31.7.2 VE 1p� c�/'j COMMON FAULTS AND SOLUTIONS <br />Q 1: What should be done in case of startup failure in dryer as its last stoppage with <br />undischarged bottle materials due to inappropriate operation during production? <br />A: <br />A: Dismantle discharge outlet and air hose of dryer after cutting down the electricity. The <br />problem will be solved after taking out all residues. <br />Note: Operations of all centrifugal dryers on the production line are the same. <br />31.8 arc A, CR Hot washing and friction unit <br />31.8.1 OPERATION PROCEDURES AND KEY POINTS <br />f Rth—SLMX)J3�AAq,A444-0ftALb PhW11-S7JfQVra&r-*HR, AA <br />(Au*,29-1) : TF -131 30 Kg, Vi 9 20 Kg, MOE0 5kg- <br />10 Kg. <br />Y���"c�����>�1S�c��'cYf��f7k x; T�#1L�t����c�#����. 'r��f�k x• �� <br />It, <br />141 <br />
The URL can be used to link to this page
Your browser does not support the video tag.