My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
4101
>
2200 - Hazardous Waste Program
>
PR0514490
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:46:03 PM
Creation date
11/1/2018 9:16:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0514490
PE
2220
FACILITY_ID
FA0011012
FACILITY_NAME
PACIFIC COAST INDUSTRIES
STREET_NUMBER
4101
Direction
N
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21222007
CURRENT_STATUS
02
SITE_LOCATION
4101 N HOLLY DR
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOLLY\4101\PR0514490\COMPLIANCE INFO 1999 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 1999 - 2016
QuestysRecordDate
6/27/2017 10:36:08 PM
QuestysRecordID
3471225
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Coast MS Induses Management Proce es <br />C9.1 Scrap Metal Handling Procedure <br />Aim <br />To insure that scrap metals are properly handled <br />Responsibility <br />All team members that are involved with the handling of scrap metal <br />Are responsible for following this operational process control <br />Method <br />Read and understand the operational process control <br />Follow the directions provided in the process control <br />Report to supervisor if unable to comply with the directions of the process control for any <br />reason. <br />Records <br />None applicable <br />References <br />None Applicable <br />Operational Procedure for: Scrap Metal Disposal <br />• Production scrap is accumulated in the designated areas of the production <br />departments and is removed from the production department daily, at the <br />end of each production shift. Production personnel as part of their daily <br />cleanup activity will deliver the accumulated scrap metal to the scrap metal <br />dumpster located at the North side of plant #1 <br />• Tool Room Scrap Metal is accumulated in the designated area of the tool <br />room and is delivered to the scrap metal dumpster at the north side of plant <br />1 as required to maintain good housekeeping. <br />• Large scrap metal objects are placed in the scrap metal dumpster by or as <br />specifically directed by management personnel only. <br />• All scrap metal is to be placed within the dumpster, no scrap material is to <br />hang out over the sides of the dumpster in order to insure safe transportation <br />of the dumpster <br />• No materials other than scrap metals are to be placed in the scrap metal <br />dumpster <br />• A designated scrap metal dealer for recycling picks up the accumulated <br />scrap metal. <br />• The Assistant Production Control Manager is to notify The Metal Recycler <br />by telephone when the dumpster is ready for pickup, and an empty container <br />is brought in to replace the unit being removed. <br />Issue: 2 October 8, 2008 Authorized By: Jasper Bullock Pagel . l <br />
The URL can be used to link to this page
Your browser does not support the video tag.