My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2200 - Hazardous Waste Program
>
PR0220079
>
COMPLIANCE INFO 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 11:46:21 AM
Creation date
11/1/2018 9:27:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0220079
PE
2248
FACILITY_ID
FA0000187
FACILITY_NAME
JR SIMPLOT CO
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
01
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOWLAND\16777\PR0220079\COMPLIANCE INFO 2008-2010.PDF
QuestysFileName
COMPLIANCE INFO 2008-2010
QuestysRecordDate
5/2/2017 6:19:24 PM
QuestysRecordID
3373032
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ray Von blue—San Joaquin County Environmental Health Departmcnt Page Z <br /> Site Specific TTU Notification—Attachment B 4/30108 <br /> RECON will construct a manifold for connecting the drain outlets from the two de-watering bins to a single <br /> discharge point. As a precautionary measure, each de-watering bin will have the ability to be isolated <br /> separately through appropriate valves and the piping will be able to be disconnected using camlock fittings. <br /> A double diaphragm pump will be connected in line with the discharge points of the de-watering bins. If <br /> necessary, rinse water may be directed to another 4,900 gallon double-contained poly tank system (see <br /> attached TTU System Diagram) for pH adjustment before final discharge to a nearby wash rack sump <br /> leading to a Class I1 surface impoundment located at the Southeast side of the Client's property. <br /> After each batch treatment of pea gravel, a bin truck will be used to pick up the de-watering bins and <br /> transport the clean pea gravel to a stockpile location designated by the Client. This process will be repeated <br /> until all of the pea gravel has been treated. <br /> Please accept this letter as formal notification of TTU operations to be conducted by DECON at our <br /> Client's site located at 16777 Howland Road, Lathrop, California. Please do not hesitate to contact me <br /> should you have any questions or concerns. Thank you for your time and attention. <br /> Sincerely, <br /> Jason M.Costello <br /> Corporate EH&S/Regulatory Compliance Manager <br /> DECON Environmental Services, Inc. <br /> 510-732-6444 Ext.20 <br /> 510-750-2099 Mobile <br /> 510-782-8584 Fax <br /> E-mail icostello(adeconenv.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.