Laserfiche WebLink
B9onitcring System Certification <br /> l+ � ` <br /> Site Address: f <br /> :� V S �� �t �(? Date of"Testing/Servicing: <br /> F. In-Tank Gauging/ SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform Ieak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com tete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment ceerr ification, was a leak simulated to verify LLD performance? <br /> El N/A (Check all that apply) Simulated leak rate: i; g.p.h.; ❑0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> es ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> U�Nes ❑ No* Was the testing apparatus properly calibrated? <br /> 15 Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes El o* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> Q N/A <br /> ❑ Yes ��N/A <br /> o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> or disconnected? <br /> ❑ Yes o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> N/A malfunctions or fails a test? <br /> ❑ Yes o* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> El <br /> FT-yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> ' Page 3 of 3 <br /> ATG Monitor Form <br />