Laserfiche WebLink
S WRCB,January 2002 Page_ of—_ <br /> 6. PIPING SUMP TESTING_ _ <br /> Test Method Developed By: O Sump Manufacturer (_I Industry Standard ^X Professional Engineer j <br /> x� <br /> j 0 Other(Spec) <br /> Test Method Used: O Pressure G Vacuum X Hydrostatic <br /> O Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#9 Sump# 10 Sump#_ Sump# <br /> Sump Diameter: 42" 4211 _— <br /> q Sump Depth: 73'/2" 74'/2" u <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 14„ No piping <br /> Hi�ehest Piping Penetration: �_ penetrations <br /> Height from Tank Top to Lowest 127" 41" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry _ <br /> Portion of Sump Tested' Water Line 44" Water Line 44" <br /> Does turbine shut down when j <br /> sump sensor detects liquid(both X Yes -3 No O NA . Yes X No DNA Yes ONo DNA U Yes No U NA <br /> �. roduct and water)?*.. ---)- - _ - <br /> Turbine shutdown response time Not Alarmed N/A <br /> Is system programmed for fai I sa Fe X Yes O No D NA X Yes J No O NA Yes O No DNA Yes IJ No NA <br /> shutdown?` <br /> Was fail-safe verified to be <br /> Yes X No DNA Yes X No DNA Yes No DNA �..�Yes No _NA <br /> operational?` __ <br /> Wait time between applying water <br /> 5 Minutes 5 Minutes <br /> and starting test:.-_-___ — _— <br /> Test Start Time: 12:55 1:00 <br /> Initial Reading(111): .001 .001 <br /> h Test End Time: 1:25 1:30 <br /> k Final Reading(RF): .001 .001 1 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Change in Reading(RF-R,): .001 .001 <br /> PassTFail"Threshold or Criteria: .005/30 Minutes .005130 Minutes <br /> Test Result: X Pass ❑Fail X Pass 0 Fail Pass ❑Fail Pass D Fail <br /> Was sensor removed for testing? X Yes O No D NA X Yes O No O NA Yes O No DNA Yes G No D"NA <br /> Was sensor properly replaced and rx <br /> Yes n No O NA X Yes O No E.1 NA Yes O No O NA Yes 0 No NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testin , and recomenended follow-up for failed tests) <br /> Piping Sump#9 is for Siphon Line for Tank#3 and Tank#4 Unleaded Regular. <br /> Piping Sump#10 is for Tank Probe Riser for Tank#5 Premium Unleaded. <br /> If the entire depth of the sump is not tested,specify how much was tested. if the answer to a_y,of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire sump must be tested. (See SWRCB LG-160) <br />