My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2007-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 4:45:49 PM
Creation date
11/1/2018 10:33:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2007-2011
FileName_PostFix
2007-2011
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page-__ of <br /> 7. UNDER-DISPENSER CONTAINMENT UDC)TESTING <br /> j Test Method Developed By: D UDC Manufacturer a Industry Standard X Professional Engineer <br /> 0 Other(Sped) <br /> ._..._. ... <br /> Test Method Used: it Pressure ❑Vacuum X Hydrostatic <br /> O Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator --.-.--,.,-----Equipment Resolution: .002 <br /> UDC#9&10 UDC# 11&12 UDC# 13&14 UDC# 15&16 <br /> UDC Manufacturer: Environ Environ Environ Environ <br /> .___..—. — _..�_. ......-.... <br /> UDC Material: Poly Plastic Poly Plastic Poly Plastic Poly Plastic <br /> UDC De the 30" 30" 29 %" 30" <br /> Height from UDC Bottom to Top 10" l0" 10" 10" <br /> il of Highest Piping Penetration: <br /> Height from UDC Bottom to ? %" 8" 9" 8" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested Water Level 12" Water Level 13" Water Level 15" Water Level 20" is <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both X Yes No I]NA X Yes No DNA X Yes No NA X Yes No (SNA <br /> L�roduct and water)?;_ <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail- X Yes -,' No L]NA X Yes ONO `"INA X Yes 0 No D NA X Yes D No []NA <br /> safe shutdown?` S <br /> Was fail-safe verified to be0' Yes X No O NA 0 Yes X No 0 NA 0 Yes X No 0 NA D Yes X No Ei NA- <br /> _operational?* <br /> 5 Minutes 5 Minutes <br /> Wait time between applying 5 Minutes 5 Minutes <br /> water and starting test <br /> -_ ._...-._._..__ _.._.._....... <br /> � <br /> Test Start Time: 8:35 8:40 8:45 8:50 I <br /> Initial Reading(R�): _ I .001 — A01 �_OOl .001 <br /> — — <br /> Test End Time: 9:05 9:10 9:I S 9:20 <br /> Final Reading(RF): .001 .001 .001 .001.. <br /> _.. - _ ...-...._ .................... i <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(Rr-ft,): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: _ — ,- X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail <br /> Was sensor removed for testing? X Yes E No C NA X Yes ONO JNA X Yes L No CNA X Yes No NA <br /> Was sensor properly replaced and <br /> X Yes No C1 NA X Yes ONO ONA X Yes No L NA X Yes ENo NA <br /> verified functional after testing? <br /> _j— <br /> Comments-(include information on repairs made prior to testing, and recommended fellow-iip for-failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.