Laserfiche WebLink
S WRCB,January 2002 Page of <br /> 9.. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested X <br /> "fest Method Developed By: C:'J Spill Bucket Manufacturer ❑ Industry Standard C: Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: C:J Pressure "'Vacuum 1:'.1 Hydrostatic � <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> � <br /> Spill.Box# Spill Box # Spill Box# `spill Box#j <br /> Bucket Diameter: I <br /> Bucket Depth: <br /> _ <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: — <br /> Initial Reading(R,): <br /> _........ —._.. —.. ........ ...... <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): — <br /> Pass/Fail Threshold or <br /> Criteria: _ <br /> .....—...__..... —..__ _.... <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ��,�P.s ❑ Fail ❑ Pass ❑ Fail <br /> Comments— (include informulion on repairs made prior to testing, crud recommendedLollow-u f2L ailed tests) <br /> Page 17 of 17 <br />