My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000081
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1235
>
3500 - Local Oversight Program
>
PR0543389
>
ARCHIVED REPORTS XR0000081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 5:36:56 PM
Creation date
11/1/2018 10:36:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0000081
FileName_PostFix
XR0000081
RECORD_ID
PR0543389
PE
3528
FACILITY_ID
FA0004512
FACILITY_NAME
MAJOR STATIONS
STREET_NUMBER
1235
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11533055
CURRENT_STATUS
02
SITE_LOCATION
1235 E ALPINE AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE A-2 <br />Monitor Well Purge Data <br />March 3 and 4, 1993 <br />Well/Sample Total Depth Presence of Three Well Volumes <br />Purged Volume <br />(feet)' Floating Product <br />(gallons) <br />(gallons) <br />MW -1 884 no <br />62 <br />62 <br />MW -2 89 7 no <br />6 8 <br />68 <br />MW -3 906 no <br />76 <br />76 <br />MW -4 108 2 no <br />172 <br />172 <br />MW -5 1054 no <br />15 8 <br />15 8 <br />MW -6 1067 no <br />169 <br />169 <br />1 Measured from top of PVC casing (TOC) <br />At the beginning, during, and end of the purge process, <br />measurements <br />were taken for Ph, <br />electrical conductivity, and temperature of the purge water <br />The values measured at the end of <br />the purge process are presented in Table A-3 <br />TABLE A-3 <br />Groundwater Parameter Values, (End of Purge) <br />March 3 and 4, 1993 <br />Sampling Procedure and Analysis Schedule <br />A sampling order was established prior to this sampling round, based on analytical results from <br />the last quarter samples The wells were sampled in the following order <br />1 MW -6 <br />2 MW -1 <br />3 MW -3 <br />4 MW -4 <br />5 MW -5 <br />6 MW -2 <br />SM\RPTMAREGIQTR WY <br />A - 2 05!13193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.