My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000129
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1235
>
3500 - Local Oversight Program
>
PR0543389
>
ARCHIVED REPORTS XR0000129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 7:40:03 PM
Creation date
11/1/2018 10:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0000129
FileName_PostFix
XR0000129
RECORD_ID
PR0543389
PE
3528
FACILITY_ID
FA0004512
FACILITY_NAME
MAJOR STATIONS
STREET_NUMBER
1235
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11533055
CURRENT_STATUS
02
SITE_LOCATION
1235 E ALPINE AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ethylbenzene and xylene (BTEX), total petroleum hydrocarbons (TPH) and lead <br /> concentrations "Simple Green" surfactant is applied by the Contractor to the tank, <br /> reportedly in an attempt to facilitate decontamination activity <br /> • July 1990, Spill report submitted to PHS/EHD <br /> • June 1991 Responsible party is identified, and Woodward-Clyde is selected to begin <br /> Remedial Investigation Remedial Investigation involves installation of wells MW-1, -2 <br /> and -3 <br /> • August 1991, Initial sampling of monitoring wells MW-1, -2 and -3 <br /> • October 1991, Remedial Investigation Report completed and submitted to PHS/EHD <br />' • November 1991 PHS/EHD responds to Remedial Investigation Report and requires <br />' quarterly groundwater monitoring and additional remedial investigation activities <br /> Hereafter, the month and year when the monitoring event was conducted is shown in parentheses <br /> • Fall 1991, First Quarterly Monitoring Event (December 199 1) <br /> • Winter 1992, Second Quarterly Monitoring Event (March 1992) <br /> • Spring 1992, Third Quarterly Monitoring Event (June 1992) <br /> • August 1992, WESTON Consultants retained to conduct a closure process for the former <br />' tank excavation, remove the fuel piping system, and continue groundwater monitoring <br /> Their investigation involves the installation of wells MW-4, -5 and -6 <br />' • October 1992, WESTON Consultants submits a September 30, 1992 Interim Report to <br /> PHS/EHD documenting additional soil remedial activities and demolition/removal of fueling <br /> system and associated infrastructure <br /> • Summer 1992, Fourth Quarterly Monitoring Event (October 1992) <br /> • Fall 1992, Fifth Quarterly Monitoring Event (December 1992) <br /> • Winter, 1993, Sixth Quarterly Monitoring Event (March 1993) <br /> SECOR International Inc (SECOR®) CRC Environmental Risk Management Inc <br /> N0026 001 01 add 2 November 30 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.