My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1624
>
2900 - Site Mitigation Program
>
PR0009012
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 8:35:06 PM
Creation date
11/1/2018 12:00:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009012
PE
2960
FACILITY_ID
FA0004532
FACILITY_NAME
FRMR KEARNEY-KPF FACILITY
STREET_NUMBER
1624
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
11708006-09
CURRENT_STATUS
01
SITE_LOCATION
1624 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Harry Mosenberger <br /> Page 2 <br /> surface water and treated or untreated groundwater. The <br /> scope of this approval shall be limited to and 2bclosure <br /> and capping of the RCRA units, ponds 1, 2a, <br /> Fourth, the last paragraph of page 10 of the Modified <br /> Closure Plan, "Because the facility soil will be <br /> decontaminated to health-based clean closure levels, <br /> post-closure care is not required by California or EPA <br /> regulations. However, Kearney has committed to limited <br /> cover maintenance and groundwater monitoring in the <br /> Post-Closure Permit Application. " , shall be removed from <br /> the Modified Closure Plan and replaced by, "Kearney shall <br /> conduct all post-closure care and monitoring required by <br /> forthcoming approved post closure permit applications and <br /> post closure plans. " . <br /> The Modified Closure Plan is hereby approved with the <br /> aforementioned modifications. You are now required to comply <br /> with the specific steps and schedule of the approved Modified <br /> Closure Plan. Failure to comply may make Kearney-KPF liable <br /> for enforcement action under RCRA authority as well as <br /> authority under CCR, Title 22. <br /> Please note that upon completion of closure, you and a <br /> certified registered professional engineer must certify that <br /> the closure was conducted in accordance with this approved <br /> Modified Closure Plan. Copies of the certification must be <br /> submitted to both DHS and EPA. <br /> Should you have any questions regarding this approval, please <br /> contact Douglas P. O'Neal at (916) 855-7748. <br /> Sincerely, <br /> 4K4D <br /> Date <br /> Val F. Siebal <br /> Regional Administrator <br /> Region 1 <br /> Jeffrey Zelikson Date <br /> Division Director <br /> U.S. Environmental Protection Agency <br /> Toxic and Waste Management Division <br /> cc: see next page <br />
The URL can be used to link to this page
Your browser does not support the video tag.