My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1624
>
2900 - Site Mitigation Program
>
PR0009012
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 8:35:06 PM
Creation date
11/1/2018 12:00:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009012
PE
2960
FACILITY_ID
FA0004532
FACILITY_NAME
FRMR KEARNEY-KPF FACILITY
STREET_NUMBER
1624
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
11708006-09
CURRENT_STATUS
01
SITE_LOCATION
1624 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•�� HARGIS+ASSOCIATES, INC• <br /> made in two vertical intervals, 70 to 100 feet below land surface (bls) <br /> and 120 to 150 feet bls. The perforations will be made by firing four <br /> shots per foot using explosive charges and steel projectiles. Both <br /> vertical intervals will be perforated at the same time. The wire line <br /> will then be removed from the well . <br /> 3. An additional volume of cement, approximately equal to twice the <br /> capacity of the casing, will then be pumped into the well under <br /> pressure to force the cement into the annulus of the well through the <br /> new perforations. Pressure will be maintained for 24 hours. <br /> This method of abandonment has been adopted by agreement between DHS, <br /> CVRWQCB and Hargis + Associates, Inc. to ensure an adequate annular seal and <br /> to prevent formation material from entering the well during or after <br /> perforating. <br /> Please feel free to contact me if you have any questions. We are <br /> tentatively scheduled to abandon deep production well DPW later this month. <br /> Sincerely, <br /> HARGIS + ASSOCIATES, INC. <br /> 7- ( <br /> Terry M. Turner <br /> Senior Hydrogeologist <br /> PTQ:clw <br /> cc. Doug O'Neal <br /> Cam Williams <br /> LTR750.010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.