Laserfiche WebLink
M <br /> r�t <br /> Document Number: 909 R 5003 <br /> PmKINGTON <br /> Procedure Rev: 5 ;Date: 5/24/07 <br /> EMERGENCY RESPONSE PROCEDURES <br /> The facility has one main maintenance shop and several smaller satellite shops. <br /> The main shop generally has one to three 55 gallon drums of petroleum based <br /> product as well as smaller, quantities of other materials associated with the <br /> maintenance of a manufacturing facility. <br /> The satellite shops serve specific areas of the facility. Small quantities of <br /> petroleum based products may be stored in these'locations: The satellite locations <br /> generally have several one and five gallon containers or kegs of product. A <br /> majority of the shops have Safety-Kleen solvent based parts washers. <br /> I <br /> 3 <br />! i 3 <br /> 909R5003 Rev. 5/20/04 - <br />