My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
820
>
2900 - Site Mitigation Program
>
PR0506609
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 10:48:22 PM
Creation date
11/1/2018 2:39:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0506609
PE
2950
FACILITY_ID
FA0007536
FACILITY_NAME
SEIBOLD CORP
STREET_NUMBER
820
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
820 S AMERICAN ST
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tSite Safety Plan • <br /> Job No. 4780201 Page .I <br /> I. INTRODUCTION <br /> This Site Safety Plan (SSP) was developed by E2C, Inc. for well drilling and soil <br /> and groundwater sampling at 820 South American Street in Stockton, <br /> ' California. The primary purpose of this SSP is to provide field personnel with an <br /> understanding of the potential chemical and physical hazards that exist or may <br /> develop during activities conducted at the site, and to provide information <br /> ' concerning emergency response in the event of a release of a hazardous <br /> substance(s) or of an accident involving a physical injury. <br /> The primary objective is to ensure the well-being of all individuals working at <br /> the site. In order to accomplish this objective, all individuals involved in <br /> ' activities at the site (excluding those involved in the temporary delivery of <br /> supplies and materials) shall read, acknowledge, and adhere to the policies and <br /> procedures established herein. All personnel assigned to the project under <br /> execution at the site will read this SSP and sign the Agreement and <br /> Acknowledgement Statement in Section X to certify that they have read, <br /> understood, and have agreed to abide by the provisions contained herein. <br /> A. Site Background <br /> Underground Storage Tanks (USTs) containing gasoline and diesel were <br /> removed from the subject site in 1989 and 1990. Soil and groundwater <br /> sampling revealed the presence of soil and groundwater impact in the area of <br /> ' the tanks. <br /> ' B. Project Description <br /> The proposed Scope of Work consists of the installation, development and <br /> sampling of one groundwater monitoring well. <br /> C. Amendments to Site Safety Plan <br /> Any change in the scope of this project, conditions at the site, or both, must be <br /> amended in writing on the SSP Amendment Sheet contained in this Plan. <br /> ' Changes to the plan must be approved by the Health and Safety Manager. <br /> tE2C, Inc. ApH14, 1997' <br />
The URL can be used to link to this page
Your browser does not support the video tag.