My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
820
>
2900 - Site Mitigation Program
>
PR0536718
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 7:14:07 PM
Creation date
11/1/2018 2:52:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536718
PE
2960
FACILITY_ID
FA0021094
FACILITY_NAME
FORMER SIEBOLD CONSTRUCTION
STREET_NUMBER
820
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729211
CURRENT_STATUS
01
SITE_LOCATION
820 S AMERICAN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emergency Contacts: <br /> Project Manager and David Vossler O(707) 523-1010 <br /> Alternate SSO C 707 477-1283 <br /> Site Safety Officer Jim Donohue O (707)523-1010 <br /> C (707)318-5870 <br /> Alternative Ryan Crawford O(707)443-8326 <br /> C 707 443-8326 <br /> Siebold Construction Property <br /> Site 820 S.American Street <br /> Stockton, California <br /> 2.2 ROUTE TO HOSPITAL <br /> St.Joseph's Medical Center is the nearest hospital to the site. A map showing the route to the Hospital <br /> is included at the end of this Safety Plan. The directions to the hospital are: <br /> • Head south on S.American Street toward E. Worth Street(171 feet). <br /> • Turn right onto E.Worth Street(0.1 miles). <br /> • Turn right onto S. California Street(1.9 miles). <br /> • St.Joseph's Medical Center will be on the right at 1800 N. California Street. <br /> 3.0 GENERAL SAFE WORK PRACTICES <br /> All personnel on site will receive the following instructions: <br /> • While on site, wear general work clothes: hard hat,chemical resistant safety boots, long pants, <br /> and cloth work clothing. <br /> • Keep hands away from face during times when they might be contaminated. <br /> • Do not eat,drink, or smoke during times when hands might be contaminated. <br /> • Stay clear of heavy machinery in operation unless involved in sampling. <br /> • Beware of the cables on the drilling rig,they can swing around and hit people. Wear your hard hat <br /> and stay aware when near the drill rig. <br /> • Take measures, such as installing barricades,to keep the public out of the drilling and sampling <br /> areas. <br /> 03009-10017-37020 2 WINZLER&KELLY <br /> August 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.