My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
820
>
2900 - Site Mitigation Program
>
PR0536718
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 7:14:07 PM
Creation date
11/1/2018 2:52:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536718
PE
2960
FACILITY_ID
FA0021094
FACILITY_NAME
FORMER SIEBOLD CONSTRUCTION
STREET_NUMBER
820
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729211
CURRENT_STATUS
01
SITE_LOCATION
820 S AMERICAN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR <br /> should force water in and out of the screened interval. Repeat the surge/swab at least 10 <br /> times at each 2-foot interval. Then swab the next two-foot screened interval. Follow each <br /> round of surging by purging. <br /> — Purging: Following each round of surging of the screened interval, the well shall be purged <br /> of water. Be sure to lower the bailer to the bottom of the well in order to"grab"the silts and <br /> clays that have settled to the bottom of the well. If a well has a large portion of fines, then <br /> the purging may be performed only using a bailer, since silts and clays can cause <br /> malfunction in the pumps. <br /> • eened interval, water must g present over the entire <br /> Please note, to develop the entire scr <br /> length of screen. In wells with little water or with very poor recharge, distilled water may be <br /> t of the <br /> watery added mull to ensure st be documented,and the waternbe ng used well. <br /> houuld be sampled fwater is added, or the of <br /> presence of contaminants. <br /> • screened interval has been adequately swabbed and <br /> Continue the process until the entire <br /> purge water is relatively clear of fine material. <br /> Contain all purge water in the drums or other containers provided. Denote the date, time and <br /> origin of the water on the containers. Include calculation of the volume of water removed from <br /> each well and observations of the presence of sediments and color/odor of water, etc., in the <br /> logbook and on the forms provided. <br /> • el readings from the point of survey mark, or from the <br /> Obtain final depth to groundwater lev <br /> North side of the top of the PVC casing, if not point of survey mark is present. Readings will be <br /> measured to the nearest 0.01 foot. Denote time and readings in logbook and on forms provided. <br /> • Conduct final decontamination procedures of any field equipment that is not disposable. <br /> • Close and secure each well upon completion of field activities. Ensure that all water storage <br /> containers are closed and secured and that the site is clean. <br /> GHD SOP MW Install&Dev <br /> 6 of 6 Rev 2114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.