Laserfiche WebLink
of the mass of petroleum hydrocarbons in the soil and groundwater, and conclusions with <br /> recommendations as appropriate for this site <br /> 5.0 ANTICIPATED SCHEDULE <br /> Upon receipt of approval of this Workplan from the CVRWQCB,Winzler&Kelly will implement <br /> this Workplan. Once the permitting process with the SJCEHD is complete and a drilling contractor <br /> is selected,the field work will be scheduled. It is anticipated that the field work can be completed <br /> within 60 days of Workplan approval,dependent upon the availability of a drilling contractor, <br /> weather conditions, and receipt of required permits and site access. <br /> 6.0 DISTRIBUTION <br /> Copies of this report will be provided to the following: <br /> Mr. James Barton <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive,#200 <br /> Rancho Cordova, CA 95670-6114 <br /> Ms. Judy Reid <br /> State Water Resources Control Board <br /> Division of Financial Assistance <br /> P. O. Box 944212 <br /> Sacramento,CA 94244-2120 <br /> Mr.Nuel Henderson,PG <br /> San Joaquin County Environmental Health Department <br /> 600 E.Main Street <br /> Stockton, CA 95202 <br /> (copy by PDF/GeoTracker) <br /> 6 W INZLER&KELLY <br /> 03009-10017-37020 August 2011 <br />