Laserfiche WebLink
1205246SV.doc <br /> September 20,2012 <br /> Page 2 of 5 <br /> Stockton, CA 95201, (209) 948-3656. All work requiring traffic control must apply for a <br /> closure number seven days prior to start of work. No closures on HOLIDAYS or <br /> WEEKENDS. All work under this permit must meet with the approval of the State <br /> Representative. <br /> Failure on the Permittee's part to comply with any provision will be cause for revocation of this <br /> permit. <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN, <br /> PERMITTEE SHALL FILL OUT AND MAIL NOTICE OF COMPLETION PROVIDED BY <br /> GRANTOR. <br /> Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State <br /> Standard Specifications Reference to Engineer in the State Standard Specifications shall include <br /> State Representative. <br /> Permittee is directed to Standard Specification section 7-1.11 Preservation of Property, and <br /> Business and Professions Code, Section 8771. Permittee shall physically inspect the work site <br /> and locate survey monuments prior to work commencement. Monuments shall be referenced or <br /> reset in accordance with Business and Professions Code. <br /> Permittee/contractor shall work with the State representative to request the necessary lane <br /> closure needed. Request shall be the week prior to the actual work. The State <br /> representative shall submit closure through the Lane Closure System (LCS) for Traffic <br /> Management Center(TMC) approval by Wednesday afternoon of the week prior. <br /> All Lane closures shall be called in by either the contractor to the TMC when the closure <br /> begins (10-97), ends (10-98), or is cancelled (10-22). The TMC can be reached (24-7) at <br /> (209) 948-7556 or 7551. <br /> Use proper traffic control devices throughout the duration of the project as per Caltrans <br /> Standard Specifications. <br /> A pre-job conference with the Permittee, Contractor, and State Representative may be required <br /> prior to start of work. Permittee shall contact the State Representative and arrange the meeting. <br /> This meeting may be waived at the discretion of the State Representative. <br /> Permittee shall, prior to commencement of any work, provide the State Representative with the <br /> name and phone number of the person in responsible charge of the work to be perfonned <br /> under this pen-nit. <br /> The general area in the vicinity of the proposed pen-nit work may be environmentally sensitive. <br /> All mitigation and related work, in accordance with General Provision No. 26, is the <br /> responsibility of the Permittee. <br /> h1 addition to the attached General Provisions, the following special provisions are also <br /> applicable: <br /> 1. Unless specifically authorized elsewhere in this permit, survey work shall not be perfonned: <br /> 2 <br />