My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
400
>
2200 - Hazardous Waste Program
>
PR0513909
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2019 1:21:58 PM
Creation date
11/2/2018 8:16:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513909
PE
2226
FACILITY_ID
FA0009574
FACILITY_NAME
INTERNATIONAL PAPER
STREET_NUMBER
400
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
400 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\V\VALPICO\400\PR0513909\COMPLIANCE INFO\2010\OIR 06-18-10.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD OPERATING PROCEDURE <br /> Procedure#: DRAFT Title: <br /> V Issue 1 <br /> Issue Date: 7/15/2010 Waste Storage Area Log Temple4nland <br /> Supersedes Date: None <br /> 1.0 Purpose <br /> 1.1 The purpose of this procedure is to maintain control over the waste stream through the means of <br /> controlling the traffic of waste through the Waste Storage Area.The use of the log as a record of those <br /> activities will give employees engaged in the waste process a control over the waste stream activities. <br /> 2.0 References <br /> 2.1 Temple-Inland Environmental Policy Summary <br /> 3.0 Definitions <br /> 4.0 Responsibility <br /> 4.1 The General Manager(GM)is responsible for ensuring there is adequate planning,resources and <br /> general oversight for the administration of this procedure. <br /> 4.2 The Production Manager(PM)is responsible to the GM for: <br /> • Ensuring adequate equipment,supplies and materials are on hand to conduct this procedure. <br /> 1 • Ensuring adequate supervision is maintained over this procedure to protect affected <br /> employees and the assets of the company. <br /> • Direct oversight in the execution of this procedure. <br /> 4.3 The Human Resources Manager(HR)is responsible to the GM for: <br /> • Providing adequate procedures and training materials for the conduct of this procedure. <br /> • Maintaining training records relevant to this procedure. <br /> 4.4 The Manufacturing Coordinator and Facilitators are responsible to the PM for providing direct <br /> supervision over employees in the conduct of this procedure. <br /> 4.5 The Maintenance Facilitator is responsible to the PM for the maintenance of facilities and equipment <br /> needed or used in the conduct of this procedure. <br /> 4.6 All employees are responsible to their immediate superior for demonstrating compliance with the <br /> elements of this procedure. <br /> 5.0 Safety <br /> 5.1 All safety rules,regulations and procedures will be observed while carrying out the activities associated <br /> with this procedure. <br /> Issued By Jim Dacayanan Authorized By: Shane Morin Page I of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.