My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VERNALIS
>
9000
>
2200 - Hazardous Waste Program
>
PR0541637
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:11:58 AM
Creation date
11/2/2018 8:28:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0541637
PE
2226
FACILITY_ID
FA0009758
FACILITY_NAME
SFPUC Tesla Treatment Facility
STREET_NUMBER
9000
Direction
W
STREET_NAME
VERNALIS
STREET_TYPE
Rd
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
9000 W Vernalis Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VERNALIS\9000\PR0541637\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
7/16/2018 5:10:22 PM
QuestysRecordID
3942164
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPERATION AND MAINTENANCE MANUAL <br />SENTINEL* UV DISINFECTION SYSTEM <br />CalgonCarbon <br />down and energy to dissipate. Lockout, tag -out procedures and all <br />applicable codes should be followed when isolating power. The <br />UV reactors should not be operated if any of the control panel <br />doors are open, and water should not be sprayed around the <br />electrical equipment. <br />Hydraulically - The isolation valves both upstream and <br />downstream of the reactor are to be completely closed off and <br />locked in position. <br />STEP 2 Drain reactor before attempting to open the Lamp End Housing covers <br />or proceeding with the investigation of a Quartz Sleeve breakage. <br />Open the air vent valve on top of the reactor followed by the drain <br />valve. <br />The vent valve must be opened prior to the drain valve in <br />order to avoid drawing a vacuum on the system. <br />STEP 3 Remove the Lamp End Housing covers to expose the UV lamps and <br />Quartz Sleeves. <br />If Mercury has been released to the air, appropriate safety <br />measures must be taken such as the use of an Air Purifying <br />a Respirator (APT) or full evacuation of area until remedial <br />action has been completed. <br />STEP 4 Remove Electrical Enclosure cover a top the Sentinel' Reactor to <br />verify the extent the water traveled. Permit to dry if necessary. <br />STEP 5 Remove Lamp and Quartz pieces, swab area inside of Lamp End <br />Housing for trace mercury. Make use of the spill kit described above <br />for this application. <br />STEP 6 Remove existing Lamp and Quartz related hardware to permit the <br />installation of new material. Refer to the Maintenance section for <br />specific instructions on removing Lamps and Quartz Sleeves. <br />Lamps operating at the time of the incident surrounding the <br />failure should also be removed and discarded if it is <br />determined they were subjected to being submersed in water <br />following the breakage. <br />CALGON CARBON CORPORATION ♦ U.V. TECHNOLOGIES DIVISION <br />COPYRIGHT 2412 ♦ ALL RIGHTS RESERVED <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.